+6012-369 5175        hlyengineeringtrading@gmail.com  

HLY Engineering Trading
93G, Jalan Puteri 5/7,
Bandar Puteri Puchong,
47100 Puchong,
Selangor, Malaysia.
+6012-369 5175
+603-8052 0048

GA Series

Previous 8 / 11 Next

GA Series G Series Preparation Unit AIRTAC


Download Files

GA-201909111154433096.PDF (1.15 MB)
1.It is installed between G series regulator (or filter & regulator) and G series Lubricator. The air flow is divided by the device that one enters Lubricator to supply oil for lubrication and the other (the second way) directly enters the equipment.
 
2.Several kinds of bracket can be ed to connect regulator and lubricator. Optional brackets are type T, type L and type U.
Please leave your enquiry here, we will reply as soon as possible.
Name*  
Company Name  
Product Interested  
Quantity  
Email*  
Contact No.*  
Attachment  
*only support gif, jpeg, jpg, png, pdf
Messages*  

Switch to Mobile Version